The Four-Week Bathroom Project That Took Four Months
Manage episode 501212921 series 3684357
What was supposed to be a clean, modern upgrade to the only full bathroom in a 1960s split-level turned into four months of dust, delays, and constant headaches. With a solid budget and a contractor who promised four to five weeks, this Rhode Island homeowner thought they were in good hands. Instead, they found themselves showering in a freezing basement with a garden hose while bills kept piling up.
Mikki and Jess walk through every misstep, from shoddy plumbing to crooked tile, and the money decisions that made a bad situation even worse. This story is not just about a failed bathroom reno, it is a cautionary tale about what happens when you lose control of your project’s budget and timeline.
Inside the Homeowner Horror Story:
- Demo dust covering the bedroom, furniture, and even inside drawers
- A tub pipe cut incorrectly, causing a $1,100 ceiling repair the contractor refused to cover
- Floor tile installed so poorly it had to be ripped out and redone for $3,000
- The risk of paying too much upfront and losing leverage when work goes wrong
- How a promised 4–5 week project left the homeowner without a real shower for four months and thousands over budget
If you are about to hire a contractor, this is your sign to protect your money, pay for completed work only, and never assume that will not happen to you.
________________
Submit your homeowner horror story:
www.chicksinconstruction.com
Follow on Social Media:
www.instagram.com/chicksinconstructionpodcast
www.facebook.com/chicksinconstructionpodcast
www.linkedin.com/company/chicksinconstructionpodcast
www.youtube.com/@ChicksInConstruction
________________
Love what you hear?
Subscribe to Chicks in Construction and share this episode with your friends because every homeowner, builder, contractor, and designer needs to hear this one!
15 episodes