Artwork

Content provided by Staticworx. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Staticworx or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://ppacc.player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Installing ESD Flooring in a 24/7 facility without disrupting operations

3:16
 
Share
 

Fetch error

Hmmm there seems to be a problem fetching this series right now. Last successful fetch was on June 27, 2021 14:07 (4y ago)

What now? This series will be checked again in the next day. If you believe it should be working, please verify the publisher's feed link below is valid and includes actual episode links. You can contact support to request the feed be immediately fetched.

Manage episode 248914615 series 2495711
Content provided by Staticworx. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Staticworx or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://ppacc.player.fm/legal.

Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it’s important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces – without adhesive or chemicals and with neither downtime nor disruption.

The post Static Bursts (Ep #7): Installing ESD Flooring in a 24/7 Facility Without Disrupting Operations appeared first on StaticWorx Learning Center.

  continue reading

21 episodes

Artwork
iconShare
 

Fetch error

Hmmm there seems to be a problem fetching this series right now. Last successful fetch was on June 27, 2021 14:07 (4y ago)

What now? This series will be checked again in the next day. If you believe it should be working, please verify the publisher's feed link below is valid and includes actual episode links. You can contact support to request the feed be immediately fetched.

Manage episode 248914615 series 2495711
Content provided by Staticworx. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Staticworx or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://ppacc.player.fm/legal.

Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it’s important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces – without adhesive or chemicals and with neither downtime nor disruption.

The post Static Bursts (Ep #7): Installing ESD Flooring in a 24/7 Facility Without Disrupting Operations appeared first on StaticWorx Learning Center.

  continue reading

21 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide

Copyright 2025 | Privacy Policy | Terms of Service | | Copyright
Listen to this show while you explore
Play